Community center, Surfside, FL. A multi-story building two blocks from the ocean with its main mechanical and vertical circulation on the parking level. Every heavy rain put the elevator pits, the fire exit doors and the stairwell at risk. The building had been relying on sandbags.
8openings protected
26 inprotection height, 3 panels
1 crewinstalled in one day
Staffdeploys in minutes
The openings
Elevator lobbies on the parking level, double fire exit doors with panic hardware, and stairwell access doors. Every outswing egress door received an interior install so the door always opens freely. Barrier spans were measured bracket to bracket on the frame, not clear door width, so each panel set fits its opening only. Panels are labeled 1, 2, 3 with the opening name and a QR code to the deployment guide.






What the building got
- One estimate covering all eight openings, line by line.
- Marine-grade 6063-T5 aluminum panels with stainless steel hardware and EPDM seals, cut to size in North Miami.
- Installation by our own crew with no permanent construction.
- A staff walkthrough on the day of installation and a per-opening deployment guide left on site.